Charles C. Parks

Tennessee

Project Details

Primus provided construction services on this multi-temperature cold dock, cooler, freezer, ice cream expansion project. The warehouse building is steel framed with insulated metal panel walls.

Freezing capacities are:

  •  -20°F Ice Cream Freezer
  •  -10°F Freezer
  •  +35°F Cooler
  •  +40°F Dock

The structural steel system is steel column, beam and steel bar joist with steel roof deck.

READY TO WORK WITH PRIMUS?

Brunch hashtag raw denim irony four loko yr readymade. Kinfolk listicle echo park tilde of.

Contact PRIMUS