LOCATION
Pennsylvania
PROJECT TYPE
Food & Beverage Processing
SERVICE
Design-Build
SQUARE FOOTAGE
98,000
Blue Ridge Capital selected Primus to provide turm-key design and construction services for Phase 1 of a new production and cold storage warehouse facility totaling 97,988 SF.
The project is master planned for over 300,000 SF and provides room for expansion on both sides of the building.
Phase 1 features include:
This facility features state-of-the art modular industrial refrigeration systems that offer the lowest power consumption, use no water and require no hazard refrigerant on site.
This project will bring 131 jobs over three years to the Lebanon Valley.
If you have an entrepreneurial spirit, a can-do attitude, and a passion for design-build, consider Primus.