Primus Team
02.26.2024
Founder and President of Primus Design Services Michael D. Jones, AIA, has been named to the CEBA Board of Directors. CEBA (Controlled Environment Building Association) is a core partner of parent group GCCA (Global Cold Chain Alliance), the highest regarded trade association in the cold storage industry. CEBA is dedicated to helping anyone interested in…
3PL/PRW
02.22.2024
Primus is pleased to announce our greenfield cold storage warehouse project in Baytown, TX has earned LEED Silver certification from the United States Green Building Council (USGBC). Since the USGBC modified its LEED score card to reflect the specific needs of the industrial sector, more and more cold storage companies have embraced sustainable design and…
General News
02.07.2024
Primus Solutions Group has ambitious goals for 2024. Achieving them requires a top-notch team of automation experts. The update below describes how this division is elevating its services by hiring and promoting the right people. STEVEN DALTON – Promoted to Automation General Superintendent Steve joined Primus in 2023. His more than 20-year career includes significant…
Cold Storage/ 3PL
11.17.2023
Kotte Trucking is a family-owned business that has been providing transportation services for over 85 years. Headquartered in Buffalo Lake, Minnesota, the company chose to expand their services to include warehousing in 2023. Kotte selected Primus to provide design-build services on their very first cross-docking warehouse: a 33,000 SF greenfield facility in Lake Alfred, FL….
Cold Storage/ 3PL
11.06.2023
Primus’ second cold storage design build project for industrial real estate developer Saxum is located in Jacksonville, FL. The 334,000 SF greenfield cold storage warehouse will have 32 dock doors, a QFR blast freezing area, de-slat area, a USDA room, freezers with temperatures ranging from -10° to 35° and the usual support spaces (conference rooms,…
Manufacturing
10.25.2023
Becton Dickinson’s new e-beam medical device sterilization facility is underway in Tucson, AZ. Primus attended the groundbreaking to celebrate the occasion. Our team is providing design-build construction services on the this 75,000 SF Greenfield facility. Spaces include: Receiving and shipping areas open to a pre-run staging and post-run staging warehouse Administration and welfare area…